Excavation Calculator
Excavation and earthwork quantity for a pit, trench or footing, in cubic metres and cubic feet, with bulking %.
Runs on your device Processed locally in your browser. Nothing is uploaded.
Concrete volume for a slab, beam, column or footing in cubic metres and cubic feet, with wastage %.
Outer dimension of one member, in the unit chosen above, up to 3 decimal places.
Outer dimension of one member, in the unit chosen above, up to 3 decimal places.
Outer dimension of one member, in the unit chosen above, up to 3 decimal places.
A whole number from 1 to 1,000,000.
An adjustable allowance for cutting and site wastage, from 0 to 50%. Defaults to 0%.
Enter the values above to see the result.
Every supported member type — general/rectangular, slab, beam, column and footing — uses the same rectangular-prism volume formula:
Unit conversions are exact: 1 mm = 0.001 m, 1 cm = 0.01 m, 1 inch = 0.0254 m and 1 foot = 0.3048 m.
The rule is exact first, round once. Every volume is calculated exactly and rounded to three decimal places only for display. For example, a 6 × 0.3 × 0.45 m beam is 0.81 m³ per beam; 4 beams are 3.24 m³ before wastage, and 5% wastage adds 0.162 m³, for a total of 3.402 m³ — not a total built from already-rounded figures.
If any dimension, converted to metres, is larger than 100 m, the calculator still gives a result but shows a warning — this usually means the wrong unit was selected (for example, metres typed where centimetres were meant), not a real member of that size.
This calculator gives concrete volume only. It does not calculate reinforcement (rebar) quantity or weight, mix design or the cement/sand/aggregate split, cost, labour or material pricing, or a bill of quantities (BOQ) or PDF report.
A 5 × 4 × 0.15 m slab, 1 member, 0% wastage:
| Input | |
|---|---|
| Member type | Slab |
| Unit | m |
| Length | 5 |
| Width | 4 |
| Depth / thickness / height | 0.15 |
| Number of members | 1 |
| Wastage % | 0% |
| Result | |
| Total concrete volume incl. wastage (m³) | 3.000 |
| Volume before wastage (m³) | 3.000 |
| Wastage volume (m³) | 0.000 |
| Total concrete volume incl. wastage (ft³) | 105.944 |
| Member type | slab |
| Unit used | m |
| Number of members | 1 |
| Wastage % | 0% |
General/rectangular, slab, beam, column and footing. All five use the same length × width × depth formula — the member type changes only the label, not the arithmetic, since every supported shape is a rectangular prism.
An adjustable allowance for material lost to cutting, spillage and site handling, applied to the volume before wastage. It defaults to 0% and can be set from 0 to 50%. A value above 50% is rejected, since it almost certainly signals a mistake rather than a real wastage rate.
No. One unit applies to length, width and depth for a given calculation. Choose the unit that matches how you measured the member, or convert your figures to one unit first.
No. This is an estimation aid, not a certified bill of quantities. Local codes, site conditions, mix design, wastage and measurement rules vary by project — verify quantities before purchase or construction, and confirm the final figures with a licensed engineer, architect or professional quantity surveyor.
A dimension over 100 m, once converted to metres, is implausible for a single rectangular concrete member and usually means the wrong unit was selected. The calculator still gives a result, since a genuinely large input is possible to describe, but flags it so you can double-check the unit.